| Capabilities |
Benefits |
| Schedule Network
Functions |
Feature rich CPM network
analysis
Robust network data entry and manipulation
Flexible network navigation tool
Real-time network calculations
Path To…Path From…
Unlimited number of networks, sub-networks, activities
and links
Unlimited numbers of summary levels
Unlimited number of calendars for activities and resources
Flexible coding to organize projects
Assign update, read, test, exclusive or no access to
network or sub-networks
Compatibility with all major planning and scheduling
applications including Microsoft® Office
Project and Primavera P3/P3E |
| Calendars |
Unlimited number of calendar
sets and calendars
Multiple calendars per network
User-defined number of working hours per day
Day or hourly-based scheduling
Easy to use calendar editor |
| Resource and Cost
Management |
Resource type libraries
Resource profiles/distribution libraries and user defined
profiles for
resource distribution
Variable Resource availability
Cost calculated from resources or as fixed Cost
Resource progress
Interactive graphics resource assignment
Automatic, semi-automatic and manual resource leveling
Unlimited number of resources
Resource type by labor, manhour, cost material and
other
Unique traceability from resource loading
Resource and time-constraint scheduling |
| Project progress
and status control |
Structured Status entry
features
Automatic analysis of current Schedule
Frontlines against volume and/or time
User-defined Weight factor calculations
Performance measurement calculations
Earned Value analysis and reporting
Forecast, Current and revised schedule calculations
and analysis
Flexible roll-ups for executive summaries
Level generated networks
Integrated resource and cost in real-time
WBS, OBS summaries
Comparison of baseline, planned, current and actual
values |
| Baseline Management |
Unlimited number of baselines
Flexible user definable inclusion of variations and
changes into baseline
Full traceability of baseline history through multiple
baselines |
| Sensitivity Analysis
and “What –If ’s” |
Comparison of two or more
plan versions
Flexible forecast functions
Revised schedule comparison |
| Change and variation
order control |
Schedule impact documentation
and analysis
Documentation of scope growth over time
Full traceability of each item of change
Status tracking of changes
Automatic comparison between baseline and current plan
and estimates |
| Project History |
Period by period data storage
of baseline, planned dates and past period performance
Full traceability through project life cycle |
| Reporting |
Integrated report generator
Fully configurable reports
User defined selection and sort and including excellent
query support for filtering
Full format and layout control
Stored report specifications, user or group
Print Preview
Report Save as option for rapid distribution. Output
as HTML, JPG, Metafiles and BMP
E-mailed enabled reporting
Barchart, Histogram, S-curves,Table graphs, Pert Charts
Extensive performance and comparison reporting
Easy creation of ad-hoc reports
Reports can be included in report packages for weekly
and monthlyreporting
Progress Charts; comparison of baseline, current, revised,
forecast and actual |